SELECT EQUIPMENT
X

E-mail a friend


Process water

Project Reference*
Contractor
Country of Installation*
Inquiry Date
Upstream treatment processes before disinfection
Secondary treatment type
Tertiary treatment
Hydraulic parameters
Min Average Max
Effluent flow rate, m3/h*
Peak Hydraulic flow to UV
Allowed head loss, mm
Physical-Chemical parameters
UV Transmission % 10mm*
TSS, mg/l
Total iron (Fe), mg/l
Dissolved iron (Fe), mg/l
COD, mg/l
Microbiological parameters
Maximum before disinfection Effluent requirements after UV disinfection
Indicate 30 day geometric mean, 95%, 90%, 85%, 80%, 75% or Max for above microbiological parameters
Total coliform, per 100 ml*
Fecal coliform, per 100 ml*
E.coli, per 100 ml*
Enterococci, per 100ml*
Installation conditions
Ambient temperature, oC
Installation
Outdoor Indoor
Operating pressure in bar
Application
Process water Cooling tower Potable water Beverage industry
Rinsing & cleaning Food industry
Other (please specify)
Project Bid Date:
Expected PO Date:
On site Delivery Date:
Remarks:
Contact information
Customer:*
Address:*
Tel:*
Fax:*
Email:*
Contact person:*
Captcha:*

Update code
* mandatory form field

PRODUCTS SELECTION